×

Reid Park Street Circuit

Reid Park, Townsville, Queensland, Australia

Track

Supercars Townsville route

© OpenStreetMap contributors · ODbL 1.0 · Provisional geometryLocal geographic scale; source coordinates are not a surveyed course plan.

Provisional outline · © OpenStreetMap contributors · ODbL 1.0

Mapped and published lap distances differ; the cause is unresolved.

Lap length
1.777 mi2.860 km
Turns
13
Lap flow
Clockwise
Opened
2009

Purpose-built park sections mixed with public streets

Track details

Driving character

The course combines traditional street-circuit bumps and barriers with smoother, purpose-built park sections. Drivers must adapt braking and kerb use as the surface character changes. Heavy braking opportunities create passing chances, but close boundaries make accurate exits essential. The combination requires a compromise in both driving style and vehicle setup.

Track specs and FIA listings

Layout & dimensions

Venue type
Semi-permanent
Measurement notes

A major unresolved published discrepancy: the FIA roster gives 3.220 km, while current Supercars engineering and resurfacing reporting states 2.860 km and its guide rounds to 2.9 km. The selected event route uses the latter. Roughly 70% of the course was purpose-built within the park, so it is more accurately described as semi-permanent than wholly ordinary city streets.

A comparable total site area was not established in the consulted sources.

Hybrid of specially built park roads and public streets. The FIA 3.220 km number is retained separately without inventing an explanation for the discrepancy.

FIA configurations

Highest listed venue grade: 3. It does not apply to every layout. Within published expiry as of 17 Nov 2026. .

Published configurations and reference widths are separate from selected-layout measurements.

  • TOWNSVILLE · Grade 3 · 2.001 mi / 3.220 km · Reference width 32.8 ft / 10 m · Listed expiry 2028-07-09 (Within listed expiry)
Driving assessment
Driving demand
8/10
Overall editorial score
6.70/10
Editorial rank
72 of 113 assessed venues

Editorial score = 40% driving character + 35% heritage + 25% current prominence. All component scores 1-10. Higher difficulty is not included as a quality bonus. Rank ties share rank.

Editorial driving demand: 1-3 approachable; 4-6 intermediate; 7-8 advanced; 9-10 expert. Not an eligibility, licence or safety rating.

Established modern Supercars street event with a distinctive mixed-road design.

Layout notes

Layouts, corners and character

The clockwise lap mixes purpose-built park sections with street-circuit surfaces and barriers. The accepted driver guide describes braking, kerbs and passing opportunities, while the series' technical explanation confirms thirteen turns. Current resurfacing changes the surface context for future driving descriptions. The 2.86 km event distance, rounded 2.9 km championship profile and 3.220 km FIA entry remain explicitly attributed rather than assumed equivalent.

Open questions

Why does the FIA entry give 3.220 km instead of the event route’s 2.86 km? No authoritative configuration-specific explanation reconciles the two published values.

Track tools
History & facilities

Overview and identity

Reid Park Street Circuit is Townsville's semi-permanent Supercars route, first raced in 2009. The selected event course is 2.86 km with thirteen turns, rather than the materially different 3.220 km entry in the FIA register. Much of the course was purpose-built inside the park, so describing it as entirely ordinary public streets would miss an important part of its identity.

Location and setting

The circuit winds through Reid Park just south of Townsville's city centre. Supercars says approximately 70 percent of its roads were specially constructed, with the remainder incorporating existing streets. Parkland, municipal transport functions and temporary race enclosures consequently overlap. The event footprint is not a permanent estate-area statistic, and nearby motorsport facilities do not supply this route with an earlier opening history.

History and development

The inaugural Townsville Supercars event took place in 2009, establishing a new national fixture near the city centre. After the 2026 meeting, an independent engineering report recommended pavement renewal. July reporting announced resealing 2.08 km of the route. Council's later project update says most work is complete, with remaining Boundary Street work expected by November 30; that is more specific than the original October target.

  • 2009 The purpose-built park and street course hosted its first Supercars meeting.
  • 2026 surface renewal The post-race project addresses pavement deterioration; the latest detailed update still distinguishes remaining work.
Open questions

Is the entire 2026 resurfacing project complete? The council’s detailed October update anticipates remaining Boundary Street works by November 30, while its summary completed-works directory labels Reid Park complete.

People and facilities

Townsville City Council commissioned the engineering report and oversees the municipal works with state funding and contractor Boral. Its project page distinguishes council-managed roads from jointly managed transport-department sections. These maintenance responsibilities are useful operational history, while Supercars provides the racing programme. Public investment and event promotion should not be collapsed into an unsupported single owner/operator field.

Approximate venue age
17 calendar years in 2026
Operating status
Active

Year of first operation at this venue, not the latest resurfacing.

Sources & research notes
Map evidence

Source snapshots: 2026-11-18.

The retained full source outline measures 2.902 km with the spherical calculation and 2.901 km with WGS84, compared with the selected operator/Supercars 2.860 km. The difference remains unresolved. Source coordinates have not been stretched or adjusted to the sporting distance.

The current FIA list prints TOWNSVILLE at 3.220 km, while the selected full Supercars route is published as 2.860 km. The FIA row supplies no route diagram explaining that difference. The measurement/configuration discrepancy remains unresolved; the outline is not a surveyed or current homologation plan.

Media and sources

Fresh championship and council sources establish the completed event and the evolving surface project. The council's detailed project update still lists remaining work, while its completed-works directory calls Reid Park resurfacing complete. That scope conflict is retained for follow-up. The older driver-guide URL failed retrieval and remains a snapshot; official maps and photography remain external archive references without new reuse rights.

Evidence and open questions

Evidence confidence: High · Venue reference C112. Research as of 2026-11-17.

  • FIA 3.220 km versus current event 2.860 km discrepancy remains unresolved.
  • Not established from consulted sources: full track width range, maximum elevation difference, longest straight, comparable total site area.

Article updated 2026-11-18.

Visitor guide notes

Reid Park has a July 2027 Supercars weekend on the calendar. The 2026 resurfacing notice and the 2027 race entry plan cover different dates.

Review due 2026-11-29.

NTI Townsville 500 2027 · Review due 2027-01-15.

Sources

Videos
Visit

Public access unconfirmed

Townsville’s roadworks information does not confirm access around the whole route or tickets for a race.

Getting there and entry

The project warns of changed road conditions, detours and temporary parking/access restrictions. Use a current closure notice rather than assume the racing route is continuously accessible.

Some arrival details are unconfirmed

Not confirmed

Which entrance and current transfer route serve Reid Park during the remaining resurfacing work?

Conditions and changing rules

Council’s October update says most work is complete but Boundary Street work is expected to continue to 30 November 2026. Planned closure dates were still subject to permit approval; no specific reopening day is adopted.

Not confirmed

Which final restrictions and opening notices govern Reid Park during the remaining resurfacing work?

Not confirmed

Viewing and admission

Which ticketed viewing areas and walking routes apply to Reid Park during the remaining resurfacing work? The construction notice does not establish a complete admitted circuit visit or final closure schedule.

Accommodation and camping

Which property or campsite and last-mile plan fit Reid Park during the remaining resurfacing work?

Complete accessible route not confirmed

Accessible visits

Which continuous accessible route and admission product serve Reid Park during the remaining resurfacing work?

Food and facilities

What food, water and visitor facilities are available for Reid Park during the remaining resurfacing work?

Outside race weekends

What ordinary-day visit or driving activity is currently bookable at Reid Park during the remaining resurfacing work?

Access notes

Partial guide · Last reviewed 2026-11-20

Spectator access and competitive driving are tied to organized events and their temporary controls. Ordinary roads and park areas resume their public functions outside closures, but resurfacing can create additional traffic restrictions. The council's current project information is therefore useful even beyond a race weekend. No routine public year-round racing-circuit track-day service is established for this route.

Race-event only for competitive driving; public park and roads outside closures

Sources
Events
Supercars event calendarChecked 21 Nov 2026

2027

9–11 Jul 2027NTI Townsville 500Advertised dates

Supercars lists the July race weekend at Reid Park. The council’s 2026 Boundary Street works are separate from the 2027 circuit closures.

Check the 2027 NTI Townsville 500

Viewing and admission

Supercars Experiences identifies Reid Park Street Circuit as the venue for its race-ticket packages. The travel offer is not a seating chart or confirmation of an available seat.

Not confirmed

Which seating or viewing area is included? The event announcement and travel-package information do not settle this detail for the NTI Townsville 500.

Accommodation and camping

The official travel-package channel describes upcoming 2027 packages. It does not establish the hotel, included nights or a confirmed reservation for this visit.

Not confirmed

Which accommodation and nights are included in the offer?

Conditions and changing rules

Supercars lists the July race weekend at Reid Park. The council’s 2026 Boundary Street works are separate from the 2027 circuit closures.

Not confirmed

What gate hours and conditions of entry apply?

Outside race weekends

The listed dates refer to this race weekend. They do not give access to a closed race circuit outside the event.

Not confirmed

Does a separate activity offer access outside race dates?

Not confirmed

Some arrival details are unconfirmed

Getting there and entry

Which event gate and transport or parking plan serve the chosen ticket?

Complete accessible route not confirmed

Accessible visits

Which step-free route, companion arrangement and accessible facilities serve the booked area?

Food and facilities

Which toilets, water points and food outlets are open in the selected zone?

2026

10–12 Jul 2026Townsville 500 · Porsche Sprint Challenge

The one-make Porsche series shared the Reid Park weekend with Supercars.

Supercars: 2026 Townsville support programme
Racing history

Signature race Townsville 500

Racing heritage

The 2026 Townsville 500 ran July 10–12. The championship's post-event resurfacing report records wins by Cam Waters, Matt Payne and Brodie Kostecki, establishing completed competition rather than just an advance calendar listing. Supporting categories add their own event histories. Lap-record claims must preserve vehicle generation and session, especially when surface renewal changes the conditions faced by subsequent competitors.

Original research snapshot · 17 November 2026

Race history

Townsville’s Reid Park course opened with the inaugural Supercars event in 2009. Purpose-built park roads were combined with existing public streets to create a venue close to the city centre. The event quickly became a regular national championship fixture and a major regional attraction. Its history is therefore concentrated in Supercars and supporting categories, rather than inherited from an older raceway or from unrelated nearby motorsport facilities.

Current uses

The Townsville 500 ran on July 10–12, 2026. After the event, official reporting announced resurfacing of approximately 2.08 km of the 2.86 km route following an engineering review. Ordinary park and road functions continue outside event controls. The event enclosure is temporary, and a routine year-round public race-circuit track-day service was not established.

Sources

↑ ↓ to moveEnter to openEsc to close